1. Introduction

Contact between vessels and terminal equipment are not uncommon. In day-to-day terminal operations, it is often the movement of cranes (or crane booms) during discharge and loading that gives rise to a risk of contact. In the matter that was decided by the Court of Rotterdam (ECLI:NL:RBROT:2024:11285), the position was reversed: a departing container vessel struck the lowered boom of a quayside gantry crane, causing substantial damage to the crane.

The terminal operator pursued the vessel owner for the costs of repair and associated losses. The Rotterdam District Court held that the vessel was at fault for departing without adequately verifying that it could do so safely, contrary to the Dutch Inland Shipping Police Regulations (Binnenvaartpolitiereglement, “BPR”). However, the court also found that the terminal operator had created a dangerous situation and failed to give adequate warning, by leaving the boom lowered over open water in darkness, without adequate lighting or warning.

2. Legal framework

Dutch liability regime for sea-going vessels and allisions

The court treated the incident as an allision, i.e. damage caused by a sea-going vessel without any vessel-to-vessel collision. The Dutch collision regime in Book 8 of the Dutch Civil Code (“DCC”) applies to sea-going vessels and, by virtue of statute, extends to allision scenarios.

The relevant provisions are, in summary:

  • Article 8:541 DCC: extends the collision regime to cases where damage is caused by a sea-going vessel without a collision having occurred.
  • Article 8:544 DCC: where a collision is caused by the fault of one vessel, the owner of the vessel at fault is obliged to compensate the loss.
  • Article 8:546 DCC: as a general rule, there are no statutory presumptions of fault in collision liability. However, where a vessel comes into contact with a fixed object (not being another vessel) which is, where necessary, properly illuminated or otherwise properly fastened in place, the vessel is liable unless it is shown that the contact was not caused by the vessel’s fault (i.e. a rebuttable presumption in that scenario).
  • Article 8:547 DCC: liability is not excluded merely because the collision was caused by the fault of a pilot, even where pilotage was compulsory.

Navigational standards: BPR and good seamanship

The court assessed fault of the vessel by reference to navigational norms found in the BPR, including:

  • Article 6.14(1) BPR: a ship may depart only after satisfying itself that it can do so without danger – commonly framed as a duty to verify (vergewisplicht).
  • Article 1.04 BPR: a general obligation to take all precautions required by good seamanship and the circumstances, including preventing damage to structures and installations along the waterway.

3. Court’s considerations

The court held that the presumption of article 8:546 DCC did not apply for two independent reasons. It was accepted that quay cranes are typically stationed midships during berthing/unberthing with booms raised. Due to maintenance, the crane in the matter at hand could not be raised, and it had been placed shortly before departure in a location that left its lowered boom in the vessel’s departure corridor. The court considered that the terminal operator could have positioned the crane differently, including with the boom up to keep the departure corridor of the vessel clear. On that basis, the crane was not secured “in an appropriate place” in respect of article 8:546 DCC.
Furthermore, the incident occurred in darkness. While quay lighting illuminated the crane’s base, the boom itself was not illuminated. The court considered a warning light on the boom would have been appropriate. Accordingly, the burden remained on the terminal operator to prove fault of the vessel.

The court held further that the vessel was at fault “at least to some extent” because it failed to satisfy its duty to verify that departure could occur without danger. It was further argued that the allision could have been avoided had the pilot and/or the Master issued earlier and/or different orders. However, the court considered that recognising the danger would not necessarily have averted contact, given the limited time available.

The court then considered whether the terminal operator was contributorily negligent in respect of the allision. The court then held that the terminal operator bore the greater share of responsibility because the allision would not have occurred if the crane had not been left at that location with its boom lowered. The court emphasised the unusual and hazardous nature of the configuration of the crane and the absence of precautionary measures (boom lighting/warning, advance notification to pilotage and/or crew, and alternative positioning). The court found that the terminal operator had created a dangerous situation and failed to give adequate warning and therefore apportioned responsibility 80/20 against the terminal operator.

4. Practical implications

For terminal operators and port service providers: where a boom must remain lowered, operators should implement and document appropriate controls, including warning lights, clear signage (where relevant), robust pre-departure communications, and – where feasible – repositioning to preserve an unobstructed departure corridor for the vessel. Even a brief pre-sail notification identifying “Crane X at position Y with the boom lowered” may improve safety and, if a claim arises, influence the apportionment of liability.

A note on VDR evidence: a VDR transcript was produced in these proceedings, capturing bridge communications shortly before the impact. While the court observed that bridge audio is not automatically admissible in civil proceedings, given the applicable statutory constraints, it nevertheless took the transcript into account insofar as both parties relied on it and its contents were not materially in dispute. The transcript supported the view that the Master repeatedly warned that the clearance was “not clear” and that there was a crane, while the pilot acknowledged seeing it and later stated that he had assumed the boom would be positioned differently.

Closing remarks

This case illustrates that, even where fault on the part of the vessel is established, significant contributory negligence by the terminal operator can substantially reduce the quantum recoverable.

A reported appeal on the decision of the Rotterdam District Court may provide further guidance on how Dutch courts balance navigational verification duties against terminal-side operational risk creation in ship–shore contact events.

Author: Daan Komen

HerikLegal advises, inter alia, on maritime, transport, insurance, and (international) trade law matters. This publication is provided for general informational purposes only and does not constitute legal advice.